Accountability
The town should be able to see the utility numbers, and a water limit, before it votes.
PPass — To pass, the data center publishes its water, electricity, and noise numbers before the vote, names an ambassador the town can call, and states a water limit the town can hold it to. A study that arrives after the vote is not that limit.
FFail — A failing grade is assigned when there is no named ambassador, when the water, electricity, or noise numbers are not public, or when water is left as a study with no limit.
Public ambassador
In order to pass, the data center must have a named ambassador to field questions and act as a company representative to the public.
Water
The water equation has two parts. The first is the gallons of water required to cool the data center. The second is the number of gallons required to cool an on-site power plant. Publishing those gallons is not enough. A passing project states a limit the town can hold it to, before the vote.
Electricity
The electricity number is the megawatts the data center will use, and the utility that will supply them. That number has to be public. Who pays for the power is a separate test.
Noise
The noise number is the level at the nearest homes. It has to be published before the vote, not after neighbors start to complain.