Households should not be the ones who pay for the campus to get its power.

PPass — To pass, a data center must legally commit to provide all of its own power, on site or at a remote power station. Households must be held harmless from any increase in rates.

FFail — A failing grade is assigned when a company uses only local electricity without providing additional generation. It is also assigned when the plan does not describe how the electricity is paid for.

  • On-site power

    The campus builds its own power and pays for it.

  • Distant power

    The power comes from somewhere else. Temporary power on the site is allowed while the transmission lines are built.

  • A rate subsidy

    If household bills rise while that power is being built, the company pays the difference. Households do not.